Carpentry projects which was complete in last season

Automatic Gate Project. We are customized this Swing Opening Gate in our work shop and installed it in Los Feliz area. We used best Germany opener for this project. Demolition old chain gate and fence old concrete blocks,  cutting trees. New concrete support for fence and gate Making custom metal frames for gate and fence […]

More details

Redwood Deck Installation. This project took around 10 days it was include: Demolition top of the deck Improving existing beam installation of new studs Frame improving Selection of the redwood planks Beams and Studs  Waterproofing Installation of the Lights for the Deck Deck Staining

More details

Redwood Stair Deck Installation. This project took around 3 week it was include: Demolition all stair deck which was builded from 50’s We decided to make new Stair Deck much stronger and another size Buying materials Making a Wooden frame for the Deck Replacing floor joist under the shed Wooden post installation Wooden Framing Installation […]

More details

Project was complete in 2 days. Modern Horizontal Gate with low budget. Buying Materials We used existed metal post We installed over wooden studs Making frame in level

More details

Making a Simple Gate. It took 2 days and was include: Demolitions of old Gate and part of fence Buying materials and measuring Post Installation Making a Wooden Gate Hanging a Gate Handle lock Installation. Staining the Gate and Fence  

More details

Small Deck Installation for child It took couple of days to complete this project it was included: Measuring and buying Materials Post Installation with concrete after that we were waiting around 10 days when is concrete will dried Making a Frame for the Deck Top installation.

More details

This Project was complete in 2 days. Improving Existing 20 years old Deck.   It Included: Removing Rotted wood Improving existing wooden frame Rebuilding stair Replacing top of the Deck Additional Post Installation Two coats of stain      

More details

Wooden Railing For Outdoor Stair. Making a Simple Wooden Railing 50ft   Process took 2 days: Measuring and making a plan. Buying Materials. Posts Installation with metal base. Making Wooden Hand Rails. Staining Wooden Railing. ( 2 coat)

More details

Stairs Deck Rebuilding   Rebuilding Stairs Deck from 60’s Process took 5 days:   Taking Measuring of old Stairs Deck Making a plan ( old stairs deck had bad stairs stringers) Buying materials ( here we used simple Douglas fir wood) Dismantling Old Stairs Deck. Stairs Deck Posts Installation. Making a Frame for a Stairs […]

More details

Making a New Wooden Deck on the Backyard The process took 8 days, it included: Deck Planning and Design. Mark the Ground for Deck. Buynig Materials. Making a Foundation in Level ( Adding Post with Concrete block ). Decking Frame. Top Installation.