Construction
and repair company.
We are insured and licensed.
Construction
and repair company
Floor Installation

We have accumulated sufficient experience to perform work on the installation and leveling of floors of any complexity and type. We guarantee our work for two full years

 

 

Installation stages include:

1) Surface preparation

2) Selection and layup of base sheets

3) Floor installation

How to begin?
Here’s a detailed look at aspects
of your bathroom remodeling:
1 Plan the pipelines
2 Select furniture and storage
3 Select plumbing fixtures
4 Address ceiling and lighting
5 Waterproof the floor
6 Select tiles

After everything is decided

 

We need to start planning the dismantling the old. We start by dismantling the plumbing fixtures, including the toilet, bathtub and sink. Then we remove the tile. For the best possible outcomes, it’s important to start fresh. We will remove all the debris to maintain cleanliness. This process takes one to two days.

Then we dismantle existing equipment

 

Then we dismantle existing equipment, removing tiles and eliminating water pipes that have become unusable. Welay a new sewage system and new electrics, including additional outlets, install a water supply system, prepare surfaces for further work and decorate for final work.

Completed Projects
/
Tiles grout replacement.
Tiles grout replacement,  old growth removal, new grout applying
200 $
Los Feliz, Los Angeles, CA, 90027
/
Tiles grout replacement.
Tiles grout replacement,  old growth removal, new grout applying
200 $
Los Feliz, Los Angeles, CA, 90027
/
Tiles grout replacement.
Tiles grout replacement,  oldgroup removal, new grout applying
200 $
Los Feliz, Los Angeles, CA, 90027
Blog news
Handy Maestro -
Construction and
repair company in Los Angeles
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.