Stair Deck Installation
Redwood Stair Deck Installation. This project took around 3 week it was include:
- Demolition all stair deck which was builded from 50’s
- We decided to make new Stair Deck much stronger and another size
- Buying materials
- Making a Wooden frame for the Deck
- Replacing floor joist under the shed
- Wooden post installation
- Wooden Framing Installation
- Making a Wooden Stringers
- Stringers Installation
- Steps Installation
- Topping the deck Installation
- Railing Installation
- Staining with special oil all inner connections
- Deck Waterproofing
- Satining Railing System
- Staining Stair Deck