Stair Deck Installation

Redwood Stair Deck Installation. This project took around 3 week it was include:

  • Demolition all stair deck which was builded from 50’s
  • We decided to make new Stair Deck much stronger and another size
  • Buying materials
  • Making a Wooden frame for the Deck
  • Replacing floor joist under the shed
  • Wooden post installation
  • Wooden Framing Installation
  • Making a Wooden Stringers
  • Stringers Installation
  • Steps Installation
  • Topping the deck Installation
  • Railing Installation
  • Staining with special oil all inner connections
  • Deck Waterproofing
  • Satining Railing System
  • Staining Stair Deck