Building of horizontal redwood railing it took around 5 days. Demolition of old railing Buying and bringing materials Post installation every 6 ft Horizontal Pickets every 4 inch Redwood handrail Installation Applying 2 coats of stain
Category: Gallery
Automatic Gate Project
Automatic Gate Project. We are customized this Swing Opening Gate in our work shop and installed it in Los Feliz area. We used best Germany opener for this project. Demolition old chain gate and fence old concrete blocks, cutting trees. New concrete support for fence and gate Making custom metal frames for gate and fence […]
Deck Rebuilding
Redwood Deck Installation. This project took around 10 days it was include: Demolition top of the deck Improving existing beam installation of new studs Frame improving Selection of the redwood planks Beams and Studs Waterproofing Installation of the Lights for the Deck Deck Staining
Deck Improving Service
This Project was complete in 2 days. Improving Existing 20 years old Deck. It Included: Removing Rotted wood Improving existing wooden frame Rebuilding stair Replacing top of the Deck Additional Post Installation Two coats of stain
Build an Interior Wall
Making a new walls steps: Making a picture ( coordination of the drawing with the client). Materials calculation. Buying and delivering materials. Metal Studs Installation. ( Top and Bottom metal installation) Metal Door Frames Installation. Hanging Drywall Patching Drywall Sanding Drywall Painting Interior Walls.
Carpentry Doors Installation
We installed two wooden doors and the hardware. Processes included: 4,5 hours of work $600 labor. Picking up the solid core doors in Home Depot. Removed the old doors. Сustom trimming both doors from two sides. Routing doors for installing door hinges. Hanging doors. Door handles installation.